After a summer of meetings and analysis of the Feasibility Study, the Facilities sub-committee presented their recommendation to the Board of School Directors to be included in the Strategic Plan as a Facilities Master Plan. Among all of the recommendations from the Hayes Design Group, the Facilities Sub-Committee suggests the following:
- Move sixth grade back to Independence Middle School.
- Close all five elementary schools. This leads to three options with varying achievement of the original considerations as detailed in the table below:
There were a few other Considerations from the Facilities sub-committee to include in the Facilities Master Plan:
- All Day Kindergarten requires at least 8 additional classrooms. This will work only if we build a new Elementary Center.
- If NAMS is the site for new Elementary / Primary Center, bus runs will be reduced from 7 campuses to two campuses, but still requires three runs and more drivers. This will allow for flexibility in school start times and faster runs.
- Administration provided evidence under separate cover on the efficacy of primary centers versus elementary centers. This will be most helpful in making a final choice.
- Dr. Jansante has prepared an analysis of the impact of the decision on the recreation department’s use of our facilities. Suffice it to say, if we plan for a full-size gym and auxiliary gym in the new building and leave one elementary building with a gym in the system in some capacity, there would be minimal disruption to the shared use of facilities.
- Related to number 4 above is the possibility of keeping Franklin as the new home of central administration and locate the facilities department there, too. We keep a gym in the district and we have a sellable property on Church Road.
- The goal for STEAM programming in K-12 in better achieved with a new building designed and equipped for this.
- There are additional capital projects that are worthy of attention and need to be considered in this plan. Specifically: (1) paving and site work at the bus garage; (2) add restroom and storage facilities to the high school campus near the practice fields; (3) support the necessary renovations at our career and technical school, Steel Center.